Benchmarking Temporary Power Solutions to Enable Cost-Effective & Reliable Energy Supply During Construction
Time: 11:00 am
day: Day2
Details:
- Comparing the most common and preferred methodologies for bridging power, considering factors such as different climate zones, supply chains and fuel availability
- Unpacking total costs of these solutions, including maintenance overheads and permitting pathways to inform design decision making
- Assessing the total cost implications of employing temporary power solutions vs waiting 12-60 months for the main power source to be connected: Is the time saved really worth the price?